Design and operation of flexible manufacturing systems : the kingdom of heuristic methods
RAIRO - Operations Research - Recherche Opérationnelle (1987)
- Volume: 21, Issue: 4, page 365-382
- ISSN: 0399-0559
Access Full Article
topHow to cite
topde Werra, D.. "Design and operation of flexible manufacturing systems : the kingdom of heuristic methods." RAIRO - Operations Research - Recherche Opérationnelle 21.4 (1987): 365-382. <http://eudml.org/doc/104929>.
@article{deWerra1987,
author = {de Werra, D.},
journal = {RAIRO - Operations Research - Recherche Opérationnelle},
language = {eng},
number = {4},
pages = {365-382},
publisher = {EDP-Sciences},
title = {Design and operation of flexible manufacturing systems : the kingdom of heuristic methods},
url = {http://eudml.org/doc/104929},
volume = {21},
year = {1987},
}
TY - JOUR
AU - de Werra, D.
TI - Design and operation of flexible manufacturing systems : the kingdom of heuristic methods
JO - RAIRO - Operations Research - Recherche Opérationnelle
PY - 1987
PB - EDP-Sciences
VL - 21
IS - 4
SP - 365
EP - 382
LA - eng
UR - http://eudml.org/doc/104929
ER -
References
top- 1. R. L. ACKOFF and E. VERGARA, Creativity in Problem Solving and Planning : a review, European J. of Operational Research, Vol. 7, 1981, pp. 1-13.
- 2. P. AFENTAKIS, A model for Layout Design in FMS, in [8], pp. 127-139.
- 2 a. J. M. BASTOS, Batching and Routing : two Functions in the Operational Planning of FMS, Report KLR 86-19 C, Brown Boveri S. A. (Baden, Switzerland).
- 3. J. C. AMMONS, C. B. LOFGREN and L. F. MCGINNIS, A large Scale Machine Loading Problem in Flexible Assembly, in [17], pp. 319-322.
- 4. M. CHAMS, A. HERTZ and D. DE WERRA, Some Experiments with Simulated Annealing for Coloring Graphs (to appear in European Journal of Operational Research). Zbl0626.90067
- 5. Y. L. CHANG, R. S. SULLIVAN, U. BAGCHI and R. WILSON, Experimental Investigation of Real-time Scheduling in Flexible Manufacturing System, in [17], pp. 355-377.
- 5. a. R. EGLESE, Heuristics in Operational Research, in: Recent Developments in Operational Research, V. BELTON and R. M. O'KEEFE eds., Pergamon Press, Oxford, 1986, pp. 49-67.
- 6. M. L. FISHER, Worst-case Analysis of Heuristic Algorithms, Management Science, Vol. 26, 1980, pp. 1-17. Zbl0448.90041MR574193
- 7. M. V. KALKUNTE, S. C. SARIN and W. E. WILHELM, Flexible Manufacturing Systems: A review of Modeling Approaches for Design, Justification and Operation, in [8], pp. 3-25.
- 8. A. KUSIAK ed., Flexible Manufacturing Systems: Methods and Studies, North-Holland, Amsterdam, 1986.
- 9. T. E. MORTON and T. L. SMUNT, A Planning and Scheduling System for Flexible Manufacturing, in [8], pp. 151-164.
- 10. H. MÜLLER-MERBACH, The Use of Morphological Techniques for OR-approaches to problems, Operational Research'75, K. B. HALEY ed., North Holland, Amsterdam, 1976, pp. 127-139.
- 11. H. MÜLLER-MERBACH, Heuristics and Their Design: a Survey, European J. of Operational Research, Vol. 8, 1981, pp. 1-23. Zbl0461.90081
- 12. H. MÜLLER-MERBACH, A Five Facets Frame for the Design of Heuristics, European J. of Operational Research, Vol. 17, 1984, pp. 313-316.
- 13. S. RAJAGOPALAN, Formulation and Heuristic Solutions for Parts Grouping and Tool Loading in Flexible Manufacturing Systems, in [16], pp. 311-320.
- 14. E. A. SILVER, R. V. VIDAL and D. DE WERRA, A Tutorial on Heuristic Methods, European J. of Operational Research, Vol. 5, 1980, pp. 153-162. MR584650
- 15. R. S. STAINTON and D. B. PAPOULIAS, Heuristics-the Relational Approach, European J. of Operational Research, Vol. 17, 1984, pp. 16-20.
- 16. K. E. STECKE and R. SURI eds., Flexible Manufacturing Systems: Operations Research Models and Applications, Elsevier, New York, 1986.
- 17. K. E. STECKE and R. SURI, Flexible Manufacturing Systems: Operations Research Models and Applications, Annals of Operations Research, Vol. 3, 1985.
- 18. K. E. STECKE, Design, Planning, Scheduling and Control Problems of Flexible Manufacturing Systems, in [17], pp. 3-12.
- 19. K. E. STECKE and J. J. SOLBERG, Loading and Control Policies for a Flexible Manufacturing System, Internat. J. of Production Research, Vol. 19, 1981, pp. 481-490.
- 20. S. SUBRAMANYAM and R. G. ASKIN, An Expert System Approach to Scheduling in Flexible Manufacturing System, in [8], pp. 243-256.
- 21. R. SURI, An Overview of Evaluative Models for Flexible Manufacturing Systems, in [17], pp. 13-21.
- 22. A. THESEN and L. LEI, An "Expert" System for Scheduling Robots in a Flexible Electroplating System with Dynamically Changing Workloads, in [16], pp. 555-566.
- 23. D. DE WERRA, An Introduction to Timetabling, European J. of Operational Research, Vol. 19, 1985, pp. 151-162. Zbl0553.90059MR779362
- 24. R. E. D. WOOLSEY and H. S. SWANSON, Operations Research for Immediate Application - a Quick and Dirty Manual, Harper and Row, New York, 1969.
- 25. S. H. ZANAKAKIS and J. R. EVANS, Heuristic "Optimization": why, when, and how to use it, Interfaces, Vol. 11, 1981, pp. 84-91.
NotesEmbed ?
topTo embed these notes on your page include the following JavaScript code on your page where you want the notes to appear.