Optimal scheduling of the -machine assembly-type flow shop
Mohamed Haouari; Thouraya Daouas
RAIRO - Operations Research - Recherche Opérationnelle (1999)
- Volume: 33, Issue: 4, page 439-445
- ISSN: 0399-0559
Access Full Article
topHow to cite
topHaouari, Mohamed, and Daouas, Thouraya. "Optimal scheduling of the $3$-machine assembly-type flow shop." RAIRO - Operations Research - Recherche Opérationnelle 33.4 (1999): 439-445. <http://eudml.org/doc/105199>.
@article{Haouari1999,
author = {Haouari, Mohamed, Daouas, Thouraya},
journal = {RAIRO - Operations Research - Recherche Opérationnelle},
keywords = {scheduling; flow shop; branch-and-bound; assembly-type production},
language = {eng},
number = {4},
pages = {439-445},
publisher = {EDP-Sciences},
title = {Optimal scheduling of the $3$-machine assembly-type flow shop},
url = {http://eudml.org/doc/105199},
volume = {33},
year = {1999},
}
TY - JOUR
AU - Haouari, Mohamed
AU - Daouas, Thouraya
TI - Optimal scheduling of the $3$-machine assembly-type flow shop
JO - RAIRO - Operations Research - Recherche Opérationnelle
PY - 1999
PB - EDP-Sciences
VL - 33
IS - 4
SP - 439
EP - 445
LA - eng
KW - scheduling; flow shop; branch-and-bound; assembly-type production
UR - http://eudml.org/doc/105199
ER -
References
top- J. CARLIER and I. REBAÏ, Two Branch and Bound algorithms for the Permutation Flow Shop Problem, European J. Oper. Res., 1996, 90, n° 2, p. 238-251. Zbl0913.90162
- M. HAOUARI and R. M'HALLAH, A Heuristic for the Two-Stage Hybrid flow Shop Problem, Oper. Res. Lett., 1997, 21, n° 1, p. 43-53. Zbl0885.90055MR1471669
- S. M. JOHNSON, Optimal Two and Three-Stage Production Schedule with Setup Times Included, Naval Res. Logist. Quart., 1954, 1, p. 61-68.
- GOTHA, Les problèmes d'ordonnancement, RAIRO-Oper. Res., 1993, 27, p. 77-150. MR1209112
- E. L. LAWLER, J. K. LENSTRA, A. H. G. RINNOOY KAN and D. B. SHMOYS, Sequencing and Scheduling: Algorithms and Complexity, in: Operations Research and Management Science, Vol.4: Logistics of Production and Inventory, North-Holland, Amsterdam, 1993, p. 445-522.
- C. Y. LEE, T. C. E. CHENG and B. M. T. LIN, Minimizing the makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem, Management Sci., 1993, 39, p. 616-625. Zbl0783.90054
- C. OGUZ and T. C. E. CHENG, Two-stage Flowshop Scheduling with a Common Second-Stage Machine, INFORMS Meeting, Los Angeles, May 1995. Zbl0883.90067
- C. N. POTTS, S. V. SEVAST-JANOV, V. A. STRUSEVICH, L. N. VAN WASSENHOVE and C. M. ZWANEVALD, The Two-Stage Assembly Scheduling Problem: Complexity and Approximation, Oper. Res., 1995, 43, p. 346-355. Zbl0837.90069MR1327420
NotesEmbed ?
topTo embed these notes on your page include the following JavaScript code on your page where you want the notes to appear.