Heuristic algorithms for preemptive scheduling in a two-stage flowshop with unrelated parallel machines and 0-1 resource requirements

Ewa Figielska

Control and Cybernetics (2009)

  • Volume: 38, Issue: 3, page 723-743
  • ISSN: 0324-8569

How to cite

top

Figielska, Ewa. "Heuristic algorithms for preemptive scheduling in a two-stage flowshop with unrelated parallel machines and 0-1 resource requirements." Control and Cybernetics 38.3 (2009): 723-743. <http://eudml.org/doc/209641>.

@article{Figielska2009,
author = {Figielska, Ewa},
journal = {Control and Cybernetics},
keywords = {preemptive scheduling; flowshop; parallel unrelated machines; resource constraints; heuristics},
language = {eng},
number = {3},
pages = {723-743},
title = {Heuristic algorithms for preemptive scheduling in a two-stage flowshop with unrelated parallel machines and 0-1 resource requirements},
url = {http://eudml.org/doc/209641},
volume = {38},
year = {2009},
}

TY - JOUR
AU - Figielska, Ewa
TI - Heuristic algorithms for preemptive scheduling in a two-stage flowshop with unrelated parallel machines and 0-1 resource requirements
JO - Control and Cybernetics
PY - 2009
VL - 38
IS - 3
SP - 723
EP - 743
LA - eng
KW - preemptive scheduling; flowshop; parallel unrelated machines; resource constraints; heuristics
UR - http://eudml.org/doc/209641
ER -

NotesEmbed ?

top

You must be logged in to post comments.

To embed these notes on your page include the following JavaScript code on your page where you want the notes to appear.

Only the controls for the widget will be shown in your chosen language. Notes will be shown in their authored language.

Tells the widget how many notes to show per page. You can cycle through additional notes using the next and previous controls.

    
                

Note: Best practice suggests putting the JavaScript code just before the closing </body> tag.