Optimisation of Production Machine Scheduling Using a Two Level Mixed Optimisation Method
Commander Anil Rana; Ajit Verma; As Srividya
The Yugoslav Journal of Operations Research (2010)
- Volume: 20, Issue: 40, page 197-212
- ISSN: 0354-0243
Access Full Article
topHow to cite
topCommander Anil Rana, Ajit Verma, and As Srividya. "Optimisation of Production Machine Scheduling Using a Two Level Mixed Optimisation Method." The Yugoslav Journal of Operations Research 20.40 (2010): 197-212. <http://eudml.org/doc/261407>.
@article{CommanderAnilRana2010,
author = {Commander Anil Rana, Ajit Verma, As Srividya},
journal = {The Yugoslav Journal of Operations Research},
keywords = {multi-criteria optimization; machine scheduling problem; makespan; cost minimization; meta-heuristics; genetic algorithm; hybrid methods},
language = {eng},
number = {40},
pages = {197-212},
publisher = {Faculty of Organizational Sciences},
title = {Optimisation of Production Machine Scheduling Using a Two Level Mixed Optimisation Method},
url = {http://eudml.org/doc/261407},
volume = {20},
year = {2010},
}
TY - JOUR
AU - Commander Anil Rana
AU - Ajit Verma
AU - As Srividya
TI - Optimisation of Production Machine Scheduling Using a Two Level Mixed Optimisation Method
JO - The Yugoslav Journal of Operations Research
PY - 2010
PB - Faculty of Organizational Sciences
VL - 20
IS - 40
SP - 197
EP - 212
LA - eng
KW - multi-criteria optimization; machine scheduling problem; makespan; cost minimization; meta-heuristics; genetic algorithm; hybrid methods
UR - http://eudml.org/doc/261407
ER -
NotesEmbed ?
topTo embed these notes on your page include the following JavaScript code on your page where you want the notes to appear.