Heuristic solving a bicriteria parallel-machine scheduling problem

Petr Fiala

Kybernetika (1997)

  • Volume: 33, Issue: 6, page 687-694
  • ISSN: 0023-5954

How to cite

top

Fiala, Petr. "Heuristic solving a bicriteria parallel-machine scheduling problem." Kybernetika 33.6 (1997): 687-694. <http://eudml.org/doc/27276>.

@article{Fiala1997,
author = {Fiala, Petr},
journal = {Kybernetika},
keywords = {production order; parallel-machine scheduling; makespan; number of job preemption; heuristic},
language = {eng},
number = {6},
pages = {687-694},
publisher = {Institute of Information Theory and Automation AS CR},
title = {Heuristic solving a bicriteria parallel-machine scheduling problem},
url = {http://eudml.org/doc/27276},
volume = {33},
year = {1997},
}

TY - JOUR
AU - Fiala, Petr
TI - Heuristic solving a bicriteria parallel-machine scheduling problem
JO - Kybernetika
PY - 1997
PB - Institute of Information Theory and Automation AS CR
VL - 33
IS - 6
SP - 687
EP - 694
LA - eng
KW - production order; parallel-machine scheduling; makespan; number of job preemption; heuristic
UR - http://eudml.org/doc/27276
ER -

References

top
  1. K. R. Baker, Introduction to Sequencing and Scheduling, Wiley, New York 1974. (1974) 
  2. T. C. E. Cheng, C. C. S. Sin, A state-of-the-art review of parallel-machine scheduling research, European J. Oper. Res. 47 (1990), 271-292. (1990) Zbl0707.90053
  3. P. Fiala S. Kurtevová, E. Vopálková, Solution approaches to multicriteria single-machine scheduling problems, Ekonomicko-matematický obzor 24 (1988), 320-333. (In Czech.) (1988) MR0968510
  4. K. Huckert R. Rhode O. Roglin, R. Weber, On the interactive solution to a multicriteria scheduling problem, Z. Oper. Res. 24 (1980), 47-60. (1980) MR0569034
  5. E. P. C. Kao, A multiple objective decision theoretic approach to one-machine scheduling problems, Comput. Oper. Res. 7 (1980), 251-259. (1980) 
  6. A. Nagar J. Haddock, S. Heragu, Multiple and bicriteria scheduling: A literature survey, European J. Oper. Res. 81 (1995), 88-104. (1995) 
  7. L. N. Van Wassenhove, K. R. Baker, A bicriterion approach to time/cost trade-offs in sequencing, European J. Oper. Res. 11 (1982), 48-54. (1982) Zbl0482.90043MR0671799
  8. L. N. Van Wassenhove, L. F. Gelders, Solving a bicriterion scheduling problem, European J. Oper. Res. 4 (1980), 42-48. (1980) MR0549373

NotesEmbed ?

top

You must be logged in to post comments.

To embed these notes on your page include the following JavaScript code on your page where you want the notes to appear.

Only the controls for the widget will be shown in your chosen language. Notes will be shown in their authored language.

Tells the widget how many notes to show per page. You can cycle through additional notes using the next and previous controls.

    
                

Note: Best practice suggests putting the JavaScript code just before the closing </body> tag.