-bottlenecks in serial production lines: Identification and application.
Chiang, S.-Y.; Kuo, C.-T.; Meerkov, S.M.
Mathematical Problems in Engineering (2001)
- Volume: 7, Issue: 6, page 543-578
- ISSN: 1024-123X
Access Full Article
topHow to cite
topChiang, S.-Y., Kuo, C.-T., and Meerkov, S.M.. "-bottlenecks in serial production lines: Identification and application.." Mathematical Problems in Engineering 7.6 (2001): 543-578. <http://eudml.org/doc/50140>.
@article{Chiang2001,
author = {Chiang, S.-Y., Kuo, C.-T., Meerkov, S.M.},
journal = {Mathematical Problems in Engineering},
keywords = {production lines; Markovian models; bottleneck identification},
language = {eng},
number = {6},
pages = {543-578},
publisher = {Hindawi Publishing Corporation, New York},
title = {-bottlenecks in serial production lines: Identification and application.},
url = {http://eudml.org/doc/50140},
volume = {7},
year = {2001},
}
TY - JOUR
AU - Chiang, S.-Y.
AU - Kuo, C.-T.
AU - Meerkov, S.M.
TI - -bottlenecks in serial production lines: Identification and application.
JO - Mathematical Problems in Engineering
PY - 2001
PB - Hindawi Publishing Corporation, New York
VL - 7
IS - 6
SP - 543
EP - 578
LA - eng
KW - production lines; Markovian models; bottleneck identification
UR - http://eudml.org/doc/50140
ER -
NotesEmbed ?
topTo embed these notes on your page include the following JavaScript code on your page where you want the notes to appear.