UET flow shop scheduling with delays
V. J. Rayward-Smith; D. Rebaine
RAIRO - Theoretical Informatics and Applications - Informatique Théorique et Applications (1996)
- Volume: 30, Issue: 1, page 23-30
- ISSN: 0988-3754
Access Full Article
topHow to cite
topRayward-Smith, V. J., and Rebaine, D.. "UET flow shop scheduling with delays." RAIRO - Theoretical Informatics and Applications - Informatique Théorique et Applications 30.1 (1996): 23-30. <http://eudml.org/doc/92524>.
@article{Rayward1996,
author = {Rayward-Smith, V. J., Rebaine, D.},
journal = {RAIRO - Theoretical Informatics and Applications - Informatique Théorique et Applications},
keywords = {NP-completeness},
language = {eng},
number = {1},
pages = {23-30},
publisher = {EDP-Sciences},
title = {UET flow shop scheduling with delays},
url = {http://eudml.org/doc/92524},
volume = {30},
year = {1996},
}
TY - JOUR
AU - Rayward-Smith, V. J.
AU - Rebaine, D.
TI - UET flow shop scheduling with delays
JO - RAIRO - Theoretical Informatics and Applications - Informatique Théorique et Applications
PY - 1996
PB - EDP-Sciences
VL - 30
IS - 1
SP - 23
EP - 30
LA - eng
KW - NP-completeness
UR - http://eudml.org/doc/92524
ER -
References
top- 1. M. R. GAREY, D. S. JOHNSON and R. SETHI, The complexity of flow shop and job shop scheduling, Math. Oper. Res., 1976, 1, pp. 117-129. Zbl0396.90041MR418895
- 2. S. JOHNSON, Optimal two and three stage production schedules with set-up times included, Nav. Res. Log. Quart., 1954, 1, pp.61-68.
- 3. J. K. LENSTRA, Private communication, 1992.
- 4. P. L. MAGGU and G. DAS, On 2 x n sequencing problem with transportation times of jobs, Pure and Applied Math. Sci., 1980, 12, No. 1-2, pp.1-6. Zbl0441.90039MR584174
- 5. R. J. M. VAESSENS and M. DELL'AMICO, Flow and open shop on two machines with transportation times and machine independent processing times is NP-hard, unpublished manuscript, 1995.
NotesEmbed ?
topTo embed these notes on your page include the following JavaScript code on your page where you want the notes to appear.