Aggregation of networks
The subject of this paper is a flow-shop based on a case study aimed at the optimisation of ordering production jobs in mechanical engineering, in order to minimize the overall processing time, the makespan. The production jobs are processed by machines, and each job is assigned to a certain machine for technological reasons. Before processing a job, the machine has to be adjusted; there is only one adjuster who adjusts all of the machines. This problem is treated as a hybrid two-stage flow-shop:...
We deal with a logistic problem motivated by a case study from a company dealing with inland transportation of piece goods in regular cycles. The problem consists in transportation of goods among regional centres – hubs of a network. Demands on transportation are contained in a matrix of flows of goods between pairs of hubs. The transport is performed by vehicles covering the shipping demands and the task is to design a cyclical route and to place a depot for each vehicle. The route depot can be...
Page 1