Skip to main content (access key 's'), Skip to navigation (access key 'n'), Accessibility information (access key '0')
EuDML - The European Digital Mathematics Library

Login | Register | (Why Register?)

  • Home
  • Advanced Search
  • Browse by Subject
  • Browse by Journals
  • Refs Lookup
Back to Simple Search

Advanced Search

Match of the following rules

Add Sub-clause

Add Another Rule

Contains the following math formula (red border means the formula is incomplete)

Formula preview

Currently displaying 1 – 3 of 3

Showing per page

Order by Relevance | Title | Year of publication

Bottlenecks with respect to due-time performance in pull serial production lines.

Li, Jingshan;  Meerkov, Semyon M. — 2000

Mathematical Problems in Engineering

On the coefficients of variation of uptime and downtime in manufacturing equipment.

Li, Jingshan;  Meerkov, Semyon M. — 2005

Mathematical Problems in Engineering

An analytical formula for throughput of a production line with identical stations and random failures.

Blumenfeld, Dennis E.;  Li, Jingshan — 2005

Mathematical Problems in Engineering

Page 1

Download Results (CSV)

Languages

  • 3 en

Document types

  • 3 Article

Journals

  • 3 Mathematical Problems in Engineering

Years

  • 2 2005
  • 1 2000

Authors

  • 3 Li, J
  • 2 Meerkov, SM
  • 1 Blumenfeld, DE
EuDML
  • About EuDML initiative
  • Feedback
  •  version 2.1.7