Heuristic Approach to Train Rescheduling
Snežana Mladenović, Mirjana Čangalović (2007)
The Yugoslav Journal of Operations Research
Similarity:
Snežana Mladenović, Mirjana Čangalović (2007)
The Yugoslav Journal of Operations Research
Similarity:
Patrice Boizumault, Philippe David, Housni Djellab (2010)
RAIRO - Operations Research
Similarity:
To cope with its development, a French operator of mobile telephone network must periodically plan the purchase and the installation of new hardware, in such a way that a hierarchy of constraints (required and preferred) is satisfied. This paper presents the “constructive repair” method we used to solve this problem within the allowed computing time (1 min). This method repairs the planning during its construction. A sequence of repair procedures is defined: if a given repair cannot...
Salido, Miguel A., Barber, Federico (2009)
Mathematical Problems in Engineering
Similarity:
Mahjoub Dridi, Imed Kacem (2004)
International Journal of Applied Mathematics and Computer Science
Similarity:
In this paper, we consider a regulation problem of an urban transportation network. From a given timetable, we aim to find a new schedule of multiple vehicles after the detection of a disturbance at a given time. The main objective is to find a solution maximizing the level of service for all passengers. This problem was intensively studied with evolutionary approaches and multi-agent techniques, but without identifying its type before. In this paper, we formulate the problem as a classical...
P. Richard, C. Proust (1998)
RAIRO - Operations Research - Recherche Opérationnelle
Similarity: