Displaying similar documents to “New representation to reduce the search space for the resource-constrained project scheduling problem”

Incorporating the strength of MIP modeling in schedule construction

Cor A.J. Hurkens (2009)

RAIRO - Operations Research

Similarity:

Linear programming techniques can be used in constructing schedules but their application is not trivial. This in particular holds true if a trade-off has to be made between computation time and solution quality. However, it turns out that – when handled with care – mixed integer linear programs may provide effective tools. This is demonstrated in the successful approach to the benchmark constructed for the 2007 ROADEF computation challenge on scheduling problems furnished by France...

France Telecom workforce scheduling problem: a challenge

Sebastian Pokutta, Gautier Stauffer (2009)

RAIRO - Operations Research

Similarity:

In this paper, we describe the methodology used to tackle France Telecom workforce scheduling problem (the subject of the Roadef Challenge 2007) and we report the results obtained on the different data sets provided for the competition. Since the problem at hand appears to be NP-hard and due to the high dimensions of the instance sets, we use a two-step heuristical approach. We first devise a problem-tailored heuristic that provides good feasible solutions and then we use a meta-heuristic...

Scheduling problems with a common due window assignment: A survey

Adam Janiak, Tomasz Kwiatkowski, Maciej Lichtenstein (2013)

International Journal of Applied Mathematics and Computer Science

Similarity:

In this article a survey of studies on scheduling problems with a common due window assignment and earliness/tardiness penalty functions is presented. A due window is a generalization of the classical due date and describes a time interval in which a job should be finished. If a job is completed before or after the due window, it incurs an earliness or a tardiness penalty, respectively. In this survey we separately analyse the classical models with job-independent and job-dependent earliness/tardiness...

Evolutionary algorithms for job-shop scheduling

Khaled Mesghouni, Slim Hammadi, Pierre Borne (2004)

International Journal of Applied Mathematics and Computer Science

Similarity:

This paper explains how to use Evolutionary Algorithms (EA) to deal with a flexible job shop scheduling problem, especially minimizing the makespan. The Job-shop Scheduling Problem (JSP) is one of the most difficult problems, as it is classified as an NP-complete one (Carlier and Chretienne, 1988; Garey and Johnson, 1979). In many cases, the combination of goals and resources exponentially increases the search space, and thus the generation of consistently good scheduling is particularly...