The search session has expired. Please query the service again.

The search session has expired. Please query the service again.

Displaying similar documents to “Achieving Optimal Design of the Production Line With Obtainable Resource Capacity”

The maximum capacity shortest path problem : generation of efficient solution sets

T. Brian Boffey, R. C. Williams, B. Pelegrín, P. Fernandez (2002)

RAIRO - Operations Research - Recherche Opérationnelle

Similarity:

Individual items of flow in a telecommunications or a transportation network may need to be separated by a minimum distance or time, called a “headway”. If link dependent, such restrictions in general have the effect that the minimum time path for a “convoy” of items to travel from a given origin to a given destination will depend on the size of the convoy. The Quickest Path problem seeks a path to minimise this convoy travel time. A closely related bicriterion problem is the Maximum...

The branch and bound algorithm for a backup virtual path assignment in survivable ATM networks

Krzysztof Walkowiak (2002)

International Journal of Applied Mathematics and Computer Science

Similarity:

Issues of network survivability are important, since users of computer networks should be provided with some guarantees of data delivery. A large amount of data may be lost in high-speed Asynchronous Transfer Mode (ATM) due to a network failure and cause significant economic loses. This paper addresses problems of network survivability. The characteristics of virtual paths and their influence on network restoration are examined. A new problem of Backup Virtual Path Routing is presented...