Scheduling under the Due Date Criterion with Varying Penalties for Lateness
Costas P.Pappis, G. I. Adamopulos (1993)
The Yugoslav Journal of Operations Research
Similarity:
Costas P.Pappis, G. I. Adamopulos (1993)
The Yugoslav Journal of Operations Research
Similarity:
Ben-Dati, Lika, Mosheiov, Gur, Oron, Daniel (2009)
Advances in Operations Research
Similarity:
V. T'kindt, J.-C. Billaut (2001)
RAIRO - Operations Research - Recherche Opérationnelle
Similarity:
This paper presents a state-of-the-art survey on multicriteria scheduling and introduces a definition of a multicriteria scheduling problem. It provides a framework that allows to tackle multicriteria scheduling problems, according to Decision Aid concepts. This problem is decomposed into three different problems. The first problem is about obtaining a model. The second one is how to take criteria into account and the third one is about solving a scheduling problem. An extension to an...
Frank Werner (1990)
RAIRO - Operations Research - Recherche Opérationnelle
Similarity:
Serafim Opricović, Lorenzo Eccher, Miodrag Isailovski (1992)
The Yugoslav Journal of Operations Research
Similarity:
Zhu, Zhanguo, Sun, Linyan, Chu, Feng, Liu, Ming (2011)
Mathematical Problems in Engineering
Similarity:
Adam Janiak (1987)
Kybernetika
Similarity:
Adam Janiak, Tomasz Kwiatkowski, Maciej Lichtenstein (2013)
International Journal of Applied Mathematics and Computer Science
Similarity:
In this article a survey of studies on scheduling problems with a common due window assignment and earliness/tardiness penalty functions is presented. A due window is a generalization of the classical due date and describes a time interval in which a job should be finished. If a job is completed before or after the due window, it incurs an earliness or a tardiness penalty, respectively. In this survey we separately analyse the classical models with job-independent and job-dependent earliness/tardiness...
C. C. Tsouros, M. Satratzemi (1994)
The Yugoslav Journal of Operations Research
Similarity:
Jan Pelikán (2011)
Kybernetika
Similarity:
The subject of this paper is a flow-shop based on a case study aimed at the optimisation of ordering production jobs in mechanical engineering, in order to minimize the overall processing time, the makespan. The production jobs are processed by machines, and each job is assigned to a certain machine for technological reasons. Before processing a job, the machine has to be adjusted; there is only one adjuster who adjusts all of the machines. This problem is treated as a hybrid two-stage...
Tianlong Gu, Parisa Bahri, Guoyong Cai (2003)
International Journal of Applied Mathematics and Computer Science
Similarity:
The effective scheduling of operations in batch plants has a great potential for high economic returns, in which the formulation and an optimal solution algorithm are the main issues of study. Petri nets have proven to be a promising technique for solving many difficult problems associated with the modelling, formal analysis, design and coordination control of discrete-event systems. One of the major advantages of using a Petri-net model is that the same model can be used for the analysis...