Improvable theory of assembly systems: Two component-one assembly machine case. Kuo, C.-T.; Lim, J.-T.; Meerkov, S.M.; Park, E. — 1996 Mathematical Problems in Engineering
Bottlenecks in serial production lines: A system-theoretic approach. Kuo, C.-T.; Lim, J.-T.; Meerkov, S.M. — 1996 Mathematical Problems in Engineering
c -bottlenecks in serial production lines: Identification and application. Chiang, S.-Y.; Kuo, C.-T.; Meerkov, S.M. — 2001 Mathematical Problems in Engineering
Improvability of assembly systems. II: Improvability indicators and case study. Chiang, S.-Y.; Kuo, C.-T.; Lim, J.-T.; Meerkov, S.M. — 2000 Mathematical Problems in Engineering
Improvability of assembly systems. I: Problem formulation and performance evaluation. Chiang, S.-Y.; Kuo, C.-T.; Lim, J.-T.; Meerkov, S.M. — 2000 Mathematical Problems in Engineering