Displaying similar documents to “On a bicriteria optimal production plan”

Scheduling preemptable jobs on identical processors under varying availability of an additional continuous resource

Rafał Różycki, Grzegorz Waligóra, Jan Węglarz (2016)

International Journal of Applied Mathematics and Computer Science

Similarity:

In this work we consider a problem of scheduling preemptable, independent jobs, characterized by the fact that their processing speeds depend on the amounts of a continuous, renewable resource allocated to jobs at a time. Jobs are scheduled on parallel, identical machines, with the criterion of minimization of the schedule length. Since two categories of resources occur in the problem: discrete (set of machines) and continuous, it is generally called a discrete-continuous scheduling...

Enumerating the Set of Non-dominated Vectors in Multiple Objective Integer Linear Programming

John Sylva, Alejandro Crema (2008)

RAIRO - Operations Research

Similarity:

An algorithm for enumerating all nondominated vectors of multiple objective integer linear programs is presented. The method tests different regions where candidates can be found using an auxiliary binary problem for tracking the regions already explored. An experimental comparision with our previous efforts shows the method has relatively good time performance.

Multicriteria scheduling problems : a survey

V. T'kindt, J.-C. Billaut (2001)

RAIRO - Operations Research - Recherche Opérationnelle

Similarity:

This paper presents a state-of-the-art survey on multicriteria scheduling and introduces a definition of a multicriteria scheduling problem. It provides a framework that allows to tackle multicriteria scheduling problems, according to Decision Aid concepts. This problem is decomposed into three different problems. The first problem is about obtaining a model. The second one is how to take criteria into account and the third one is about solving a scheduling problem. An extension to an...