Displaying similar documents to “Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm.”

Reservation table scheduling: branch-and-bound based optimization . integer linear programming techniques

Hadda Cherroun, Alain Darte, Paul Feautrier (2007)

RAIRO - Operations Research

Similarity:

The recourse to operation research solutions has strongly increased the performances of scheduling task in the High-Level Synthesis (called hardware compilation). Scheduling a whole program is not possible as too many constraints and objectives interact. We decompose high-level scheduling in three steps. Step 1: Coarse-grain scheduling tries to exploit parallelism and locality of the whole program (in particular in loops, possibly imperfectly nested) with a rough view of the target...

Scheduling multiprocessor tasks on two parallel processors

Jacek Błażewicz, Paolo Dell'Olmo, Maciej Drozdowski (2002)

RAIRO - Operations Research - Recherche Opérationnelle

Similarity:

In this work scheduling multiprocessor tasks on two parallel identical processors is considered. Multiprocessor tasks can be executed by more than one processor at the same moment of time. We analyze scheduling unit execution time and preemptable tasks to minimize schedule length and maximum lateness. Cases with ready times, due-dates and precedence constraints are discussed.

A branch-and-cut algorithm for a resource-constrained scheduling problem

Renaud Sirdey, Hervé L. M. Kerivin (2007)

RAIRO - Operations Research

Similarity:

This paper is devoted to the exact resolution of a strongly -hard resource-constrained scheduling problem, the , which arises in relation to the operability of certain high-availability real-time distributed systems. Based on the study of the polytope defined as the convex hull of the incidence vectors of the admissible process move programs, we present a branch-and-cut algorithm along with extensive computational results demonstrating its practical relevance, in terms of both exact...