Batch scheduling problem with due-date and fuzzy precedence relation

Xuesong Li, Hiroaki Ishii, Minghao Chen (2012)

Kybernetika

A single-machine batch scheduling problem is investigated. Each job has a positive processing time and due-date. Setup times are assumed to be identical for all batches. All batch sizes cannot exceed a common upper bound. As in many practical situations, jobs have to be subject to flexible precedence constraints. The aim of this paper is to find an optimal batch sequence. The sequence is to minimize the maximal completion time and maximize the minimum value of desirability of the fuzzy precedence....

Block decomposition approach to compute a minimum geodetic set

Tınaz Ekim, Aysel Erey (2014)

RAIRO - Operations Research - Recherche Opérationnelle

In this paper, we develop a divide-and-conquer approach, called block decomposition, to solve the minimum geodetic set problem. This provides us with a unified approach for all graphs admitting blocks for which the problem of finding a minimum geodetic set containing a given set of vertices (g-extension problem) can be efficiently solved. Our method allows us to derive linear time algorithms for the minimum geodetic set problem in (a proper superclass of) block-cacti and monopolar chordal graphs....

Currently displaying 1 – 7 of 7

Page 1