Random inspection schedules with non-decreasing intensity
A new approach to manage actuator redundancy in the presence of faults is proposed based on reliability indicators and a reference governor. The aim is to preserve the health of the actuators and the availability of the system both in the nominal behavior and in the presence of actuator faults. The use of reference governor control allocation is a solution to distribute the control efforts among a redundant set of actuators. In a degraded situation, a reconfigured control allocation strategy is...
The problem considered in this paper is the minimization of the lifetime variance of a complex system subject to its expected life and economic constraints. The example of a bridge network, in which all elements have constant failure rates, illustrates the problem. A numerical algorithm for solving this optimization problem by using exact formulae for system lifetime moments is included. Using this algorithm, we can obtain results better than the solutions known from earlier papers.
This paper proposes a novel approach to reliability evaluation for active Fault Tolerant Control Systems (FTCSs). By introducing a reliability index based on the control performance and hard deadline, a semi-Markov process model is proposed to describe system operation for reliability evaluation. The degraded performance of FTCSs in the presence of imperfect Fault Detection and Isolation (FDI) is reflected by semi-Markov states. The semi-Markov kernel, the key parameter of the process, is determined...
The availability of a system with dependent units is obtained in the case where the system fails when one of the essential units fails. Markov model is assumed. The system considered consists of dependent units of which units are essential units. A unit is said to be essential if its failure causes the system to fail. The mean and variance of time to system failure are given. Unit reliability is also discussed.
To cope with its development, a French operator of mobile telephone network must periodically plan the purchase and the installation of new hardware, in such a way that a hierarchy of constraints (required and preferred) is satisfied. This paper presents the “constructive repair” method we used to solve this problem within the allowed computing time (1 min). This method repairs the planning during its construction. A sequence of repair procedures is defined: if a given repair cannot be achieved...
To cope with its development, a French operator of mobile telephone network must periodically plan the purchase and the installation of new hardware, in such a way that a hierarchy of constraints (required and preferred) is satisfied. This paper presents the “constructive repair” method we used to solve this problem within the allowed computing time (1 min). This method repairs the planning during its construction. A sequence of repair procedures is defined: if a given repair cannot be achieved...