The Flow Networks Approach to Decision Analysis in Construction Industry
Minimizing shutterings assembling time on construction sites can yield significant savings in labor costs and crane moves. It requires solving a pairing problem that optimizes the ability for the crane to move chains of shutterings as a whole when they can be later reused together to frame another wall of the site. In this paper, we show that this problem is NP-hard in the strong sense as well as both its multiflow and ordering aspects. We also introduce a linear relaxation that computes reasonably...