Planification à moyen terme de la production d'un satellite défilant et ensembles stables
Minimizing shutterings assembling time on construction sites can yield significant savings in labor costs and crane moves. It requires solving a pairing problem that optimizes the ability for the crane to move chains of shutterings as a whole when they can be later reused together to frame another wall of the site. In this paper, we show that this problem is NP-hard in the strong sense as well as both its multiflow and ordering aspects. We also introduce a linear relaxation that computes reasonably...