Page 1

Displaying 1 – 1 of 1

Showing per page

Batch scheduling problem with due-date and fuzzy precedence relation

Xuesong Li, Hiroaki Ishii, Minghao Chen (2012)

Kybernetika

A single-machine batch scheduling problem is investigated. Each job has a positive processing time and due-date. Setup times are assumed to be identical for all batches. All batch sizes cannot exceed a common upper bound. As in many practical situations, jobs have to be subject to flexible precedence constraints. The aim of this paper is to find an optimal batch sequence. The sequence is to minimize the maximal completion time and maximize the minimum value of desirability of the fuzzy precedence....

Currently displaying 1 – 1 of 1

Page 1